After-sales Service: | Online |
---|---|
Warranty: | 12 Months |
Type: | Cutting Machine |
Still deciding? Get samples of US$ 4800/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Xuvol Grapple Specifications | WYJ-300P | |
Whole Grapple | Grapple Type | single cylinder/bunching grapple/doubble link |
Steel material | Q355B | |
Optional electric control | √ | |
Height when clamped(mm) | 1660 | |
Height when opened(mm) | 2417 | |
Width of inner/outer clamp(mm) | 779/880 | |
Open Width Max(mm) | 3200±30 | |
Minimum holding circle(mm) | <=φ230 | |
Maximum holding circle(mm) | φ1250 | |
Weight (excluding rotation)kg | 3000 | |
Suitable Excavator(Ton) | 30-35 | |
Rotation Support | Rotation method(grapple) | Internal meshing vertical rotation |
Module / raceway diameter | M7/683 | |
Rotation Motor | Motor type | Plunger reduction motor |
Pressure(Mpa) | 12 | |
Hydraulic cylinder | Rod diameter/bore size | 110/160 |
Pressure(Mpa) | 21 |
Other Brand Grapple | Xuvol Grapple |
Proportional control is not available, and the action has a big damage to the object | Electro-hydraulic proportional control can be control to realize the integration of electro-hydraulic, soft and flexible action |
Rely on manual control the pressure of the grapple, Poor Personal skills will easily cause damage to the gripping objects | It can be clamped automatically, and the clamping time (0.1~1 second) and clamping pressure are adjustable, which can effectively protect the clamped object |
Unable to weigh | It can weigh the gripped objects and store the data |
Unable to send data | Data could be sent to the operator timely, ensure manage the material in time |